Projects

Setting up of a 100 kg per day bio-methanation plant in NTPC Farakka

August 1, 2019
| Ongoing project

The main objective of this project is to install a solid waste treatment plant based on TERI's Enhanced Acidification and Methanation (TEAM) technology at PTS township, NTPC Farakka. This plant would treat 100 kg of organic waste generated from the kitchen. TERI will supply the TEAM equipment, erect, and commission the plant.

Development of Flood Warning System for Guwahati & Jorhat Town

August 1, 2019
| Ongoing project
| Environment

TERI in collaboration with the National Centre for Medium Range Weather Forecasting (NCMRWF), India; TERI School of Advanced Studies (TERI SAS) and the Norwegian Research Center (NORCE) have undertaken this study with support from the Assam State Disaster Management Authority and the Norwegian Ministry of Foreign Affairs with an aim to enhance disaster preparedness of Guwahati and Jorhat cities

Integrated development of four VP in Goa through Convergence of Government Schemes

July 15, 2019
| Ongoing project

The National Rural Livelihood Mission’s (NRLM) main objective is to organize the poor into SHGs (self-help groups) and make them capable for self-employment.  The challenge is to unleash their capabilities to generate meaningful livelihoods and enable them to come out of poverty.

India prepares to host UN conference to curb land degradation

July 12, 2019
| Ongoing project
| Land

Around 147 million hectares in India is undergoing some form of degradation. India needs sustainable management of land, forest, and water.

Initiatives with NEDO in energy domain during 2019-2020

July 10, 2019
| Ongoing project
| Energy

This study will cover the following two topics: (1) Studies on Indian Government Policy: The aim of the proposed study is to monitor the policy level changes and initiatives in renewable energies and advanced industrial technologies, to provide a clear picture of how India is progressing towards its objectives of promoting cleaner energy sources.

Formation, Promotion and Nurturing of one Farmer Producer's Organization

July 2, 2019
| Ongoing project
| Sustainable Agriculture

The main objective of this project is to establish a Farmer Producer Organization at Block Okhalkanda, District Nainital for the benefit of farmers.

Technical Assistance During Implementation of a Line of Credit for Energy Efficiency Measures

July 1, 2019
| Ongoing project
| Energy Efficiency | Energy

The overall objectives of the project are: (1) Reduction of energy efficiency, energy savings and reduction of greenhouse gas (GHG) emissions in the Indian Micro, Small and Medium Enterprises (MSME) sector; (2) Promoting the use of energy efficiency and climate friendly cooling and refrigeration equipment; (3) Strengthening the capacity of SIDBI to sustainabl

Research and capacity building on SDG 12

July 1, 2019
| Ongoing project

The objective of the project is to contribute to strengthening national policies on Sustainable Consumption and Production in India while supporting SDG 12 goal implementation and reporting.

Strengthen National Climate Policy Implementation: Comparative Empirical Learning & Creating Linkage to Climate Finance (SNAPFI)

July 1, 2019
| Ongoing project
| Climate Change

International climate finance (ICF) is a vital means for supporting the implementation of nationally determined contributions (NDCs) of emerging and developing countries and facilitating the enhancement of climate ambitions. The overall aim of the project is to explore the implementation of NDCs in different geographies, and how this can be supported through ICF.

Consultancy services for setting up of a floating solar power plant of suitable capacity in JNPT, Navi Mumbai

June 29, 2019
| Ongoing project

The main objectives of this project are to prepare detailed feasibility report, detailed project report, bid evaluation services, and supervise the installation and commissioning for setting up a suitable capacity floating Solar PV plant in JNPT, Mumbai.