December 5, 2007 to
June 25, 2012
The project is being executed in Bilaspur and Kamrup districts of Himachal Pradesh and Assam respectively. It aims to provide quality planting material produced through conventional methods as well as through tissue culture, promote scientific method of cultivation, demonstrate on-farm production of biofertilizers and biopesticides, promote micro-entrepreneurship, etc. Under this project, planting material of large cardamom, banana, pineapple, turmeric, ginger and potato shall be provided to the farmers. through Training and Demonstration for Cultivation of High Value Plantation Crops¿.
May 1, 2009 to
June 22, 2012
By offering a forum for open and inclusive dialogue between all major stakeholders, the roundtable tries to find practical and empowering solutions to the problem of global climate change governance. The objective is to locate some of the key questions in the climate change negotiations in an ethical context and undertake discussions pertaining to their legal, economic and political aspects. We believe that this would offer a guiding framework for policymaking exercise, which would ensure that the ethical essence of efforts to address climate change is protected.
June 1, 2010 to
June 22, 2012
Main objective of the project are:
1. To conduct research on the experience of the CDM Project development in large energy intensive sectors
2. To propose the CDM reform basd on the CDM capacity building activities in India
October 14, 2011 to
June 22, 2012
The fifth phase of the project aims at promoting power distribution network efficiency in India. The project proposes to analyze factors for T&D (transmission and distribution) losses; AT&C (aggregate technical and commercial) losses; solutions to reduce T&D losses and effect on introducing energy-efficient transformers.
May 26, 2011 to
June 22, 2012
The objective of this project is to promote development of potential emission reduction in large energy intensive sectors with a view to the CDM reform and new market mechanisms.
May 21, 2008 to
June 22, 2012
The activity involves preparation of Project Design Document (PDD)for 3.0 MW BEL wind turbine under CDM under the guidelines given by UNFCCC. The project also involves assisting BEL during host country approval, validation process and registration
April 11, 2008 to
June 22, 2012
DRL Corporate GHG accounting
September 1, 2008 to
June 22, 2012
Heavy metals reach our air, water, and soil predominantly as a result of industrial activities. Rising levels in soil over a long period are a major concern because of health risks caused even by low degree of exposure. Cadmium, Lead and Mercury has been particularly implicated for adverse effects on health.
April 23, 2010 to
June 21, 2012
RETScreen is a free software developed by The Natural Resources, Canada, for evaluating clean energy projects. TERI has experts trained and certified by The Natural Resources, Canada to train engineers and project managers to use RETScreen software. Under this project funded by The Natural Resoruces, Canada TERI will be organising a training workshop.
July 2, 2010 to
June 21, 2012
The biomass gasification is one of the emerging green technological options which are available today. The high conversion efficiency coupled with the reduction in emission makes the gasification process suitable for widespread application.